Basis of Re-Entry Design - Swamp Region, Nigeria
Development of the Basis of Design (BoD) for an onshore re-entry campaign into a 35- year old well that involves a visual survey, rigless casing integrity test, re-entry, WLL, re-perforations, DST and well completions with a dual tubing configuration.